.
Suggestion?
I would like NHSEO to post 20 confirmed links (or whatever) to 10 sites (or whatever) over a 24 hour cycle?
Thus, it must post 20 links for a specific site?Then it must stop and start posting to the second site, stop at 20 links, and thereafter start posting to the third site and so on until it finish at site 10?
If the program took 18 hours to post to all 10 sites it must stop the posting until another 6 hours have passed (24 in total) and then restart the cycle thereafter.
Thus, it will post 20 links per 24 hours for as long as needed, to all the specified sites.
Possible?
Suggestion?
I would like NHSEO to post 20 confirmed links (or whatever) to 10 sites (or whatever) over a 24 hour cycle?
Thus, it must post 20 links for a specific site?Then it must stop and start posting to the second site, stop at 20 links, and thereafter start posting to the third site and so on until it finish at site 10?
If the program took 18 hours to post to all 10 sites it must stop the posting until another 6 hours have passed (24 in total) and then restart the cycle thereafter.
Thus, it will post 20 links per 24 hours for as long as needed, to all the specified sites.
Possible?