⚡ 31 Million HTTP/S & SOCKS 4/5 Residential IP's Backconnect Private Proxies ⚡

Is the 31M IP pool still active and regularly refreshed? I’d also like to know whether sticky sessions are supported and how long the same IP can be maintained.
 
Hello, I placed an order for the 50GB plan on the 10th, which was priced at $37.50. However, a total of $175 was deducted from my account after payment — this is much higher than the listed price.

My invoice number is #55AgA.
 
Is the 31M IP pool still active and regularly refreshed? I’d also like to know whether sticky sessions are supported and how long the same IP can be maintained.
We have upgraded our products and brought many updates such as:
  • a new pool of 205M+ residential IPs, compared to the old one of 31M
  • advanced geo-targeting: you can now geo target by country, region, city or ASN
  • advanced session management: you can now get a new IP for each request, or use session ids for keeping the same IP for a desired time period (we recommend the maximum length to be under 30 minutes)
  • overall speed and reliability improvement
 
Hello, I placed an order for the 50GB plan on the 10th, which was priced at $37.50. However, a total of $175 was deducted from my account after payment — this is much higher than the listed price.

My invoice number is #55AgA.
Fixed, DM Sent.
 
Hi, Member ID #70703.
I originally bought the 50GB plan for testing and upgraded to the 200GB plan as the quota was insufficient.
My dashboard shows two conflicting dates: bandwidth resets on Aug 13 (original 50GB cycle), while the renewal date is Aug 28.
Could you confirm:
Will my remaining 178.84GB traffic be cleared on Aug 13?
Why are these two dates different after upgrading?
I expected upgrading to a higher tier would start a new monthly bandwidth cycle from the upgrade date. Thank you.
 
Hi, Member ID #70703.
I originally bought the 50GB plan for testing and upgraded to the 200GB plan as the quota was insufficient.
My dashboard shows two conflicting dates: bandwidth resets on Aug 13 (original 50GB cycle), while the renewal date is Aug 28.
Could you confirm:
Will my remaining 178.84GB traffic be cleared on Aug 13?
Why are these two dates different after upgrading?
I expected upgrading to a higher tier would start a new monthly bandwidth cycle from the upgrade date. Thank you.
Hello! The correct date is August 28 for both renewal and bandwidth reset. We have fixed the display issue.
 
Back
Top